2019 National Chung Cheng University Social Responsibility and Sustainability Report Section 7.1.5 page 119 highlights the following event as Affordable and Clean Energy to achieve the SDGs. 1. In 2018-2019, the investment funds of campus power supply transformer load rate increase and energy-saving improvement project were 18,369,372 (in thousand TMD) 2. In 2018, the investment funds of sports center high-efficiency heat pump hot water energy saving improvement project were 5,281.869 (in thousand TMD) 3. In 2017, sports center air conditioning and energy management system energy-saving performance assurance project were 18,415.2 (in thousand TMD) 4. In 2016, replacing library lighting with energy saving performance contracts (ESCO) were 15,617.694 (in thousand TMD) 5. In 2015-2015, the renewal project loop line and transformer increase load rate improvement project were 17,435.039 (in thousand TMD) 6. In 2015, the campus power loop line and transformer increase load rate improvement project were 5,730 (in thousand TMD) 7. In 2015, the university dormitory hot water system energy saving performance contracts (ESCO) project were 42,600 (in thousand TMD)